ST SQR.75 MM TO SPECN.BS:3S144:1995(1999)GD S144H
LFVD WITH CAL.SILICIDE TREATMENT.INCLUSION RATINGCHART
SECONDARY REFINING STEEL AS PER SPECN.IS:4163-82,i.e.THN/THK
SULPHIDE:1.5-1,ALUMINA:1.5-1,SILICATE:1.5-1,GLOBULAR OXIDE:
2.0-1.
Specification
ST SQR.75 MM TO SPECN.BS:3S144:1995(1999)GD S144H
LFVD WITH CAL.SILICIDE TREATMENT.INCLUSION RATINGCHART
SECONDARY REFINING STEEL AS PER SPECN.IS:4163-82,i.e.THN/THK
SULPHIDE:1.5-1,ALUMINA:1.5-1,SILICATE:1.5-1,GLOBULAR OXIDE:
2.0-1.
Firm must submit the details of Manufacturing Technologies and Inspection/Testing Facilities available with the firm for manufacturing the subject items. . Quality assurance plan (IF ANY) related to production and inspection to be submitted in technical bid. List of Plant & Machineries required for manufacturing of subject item to be submitted.
Firm must submit the details of Manufacturing Technologies and Inspection/Testing Facilities available with the firm for manufacturing the subject items. . Quality assurance plan (IF ANY) related to production and inspection to be submitted in technical bid. List of Plant & Machineries required for manufacturing of subject item to be submitted.
Firm must submit the details of Manufacturing Technologies and Inspection/Testing Facilities available with the firm for manufacturing the subject items. Quality assurance plan (IF ANY) related to production and inspection to be submitted in technical bid. List of Plant & Machineries required for manufacturing of subject item to be submitted.
Firm must submit the details of Manufacturing Technologies and Inspection/Testing Facilities available with the firm for manufacturing the subject items. Quality assurance plan (IF ANY) related to production and inspection to be submitted in technical bid. List of Plant & Machineries required for manufacturing of subject item to be submitted.
HAMMER DRG NO SK3143/71 (DS CAT NO.1005-008003) FOR LMG 5.56MM IN FINISHED CONDITION FORGING TO BE SUPPLIED BY SAF AGAINST L.F.0412079014. DC NO.26922-SA, DT.29.08.16.”
Specification
HAMMER DRG NO SK3143/71 (DS CAT NO.1005-008003) FOR LMG 5.56MM IN FINISHED CONDITION FORGING TO BE SUPPLIED BY SAF AGAINST L.F.0412079014. DC NO.26922-SA, DT.29.08.16.”
STEEL ROD 32.00MM DIA-0.1MM HOT ROLLED PEELED BAR IN EXACT LENGTH OF 760MM +2MM EACH PIECE TO SPECN.BS 970 PT:1:1983. GD 835 M15 WITH RESTRICTION OF S%=0.01 MAX,P%=0.015MA X,(S+P)%=0.022MAX,VACUAM DEGASED & DEVOID OF UNDESIRABLE ELEMENT AL.,V,W ETC. ACCEPTANCE CRITERIAS PER:QAINO.QA-1/QAI/15
Specification
STEEL ROD 32.00MM DIA-0.1MM HOT ROLLED PEELED BAR IN EXACT LENGTH OF 760MM +2MM EACH PIECE TO SPECN.BS 970 PT:1:1983. GD 835 M15 WITH RESTRICTION OF S%=0.01 MAX,P%=0.015MA X,(S+P)%=0.022MAX,VACUAM DEGASED & DEVOID OF UNDESIRABLE ELEMENT AL.,V,W ETC. ACCEPTANCE CRITERIAS PER:QAINO.QA-1/QAI/15
1) Chemical & Mechanical properties as per std. given drawing /Specification.
2) Dimensional inspection for all dimension given in the drawing & other parameter which are mentioned in relevant drawing/specification.
Firm must submit the details of Manufacturing Technologies and Inspection/Testing Facilities available with the firm for manufacturing the subject item. Quality assurance plan (IF ANY) related to production and inspection to be submitted in technical bid. List of Plant & Machineries required for manufacturing of subject item to be submitted.
Firm must submit the details of Manufacturing Technologies and Inspection/Testing Facilities available with the firm for manufacturing the subject item. Quality assurance plan (IF ANY) related to production and inspection to be submitted in technical bid. List of Plant & Machineries required for manufacturing of subject item to be submitted.
Firm must submit the details of Manufacturing Technologies and Inspection/Testing Facilities available with the firm for manufacturing the subject item. Quality assurance plan (IF ANY) related to production and inspection to be submitted in technical bid. List of Plant & Machinery required for manufacturing of subject item to be submitted.
Firm must submit the details of Manufacturing Technologies and Inspection/Testing Facilities available with the firm for manufacturing the subject item. Quality assurance plan (IF ANY) related to production and inspection to be submitted in technical bid. List of Plant & Machinery required for manufacturing of subject item to be submitted.
Firm must submit the details of Manufacturing Technologies and Inspection/Testing Facilities available with the firm for manufacturing the subject item. Quality assurance plan (IF ANY) related to production and inspection to be submitted in technical bid. List of Plant & Machineries required for manufacturing of subject item to be submitted.
Firm must submit the details of Manufacturing Technologies and Inspection/Testing Facilities available with the firm for manufacturing the subject item. Quality assurance plan (IF ANY) related to production and inspection to be submitted in technical bid. List of Plant & Machineries required for manufacturing of subject item to be submitted.
Firm must submit the details of Manufacturing Technologies and Inspection/Testing Facilities available with the firm for manufacturing the subject item. Quality assurance plan (IF ANY) related to production and inspection to be submitted in technical bid. List of Plant & Machineries required for manufacturing of subject item to be submitted.
Firm must submit the details of Manufacturing Technologies and Inspection/Testing Facilities available with the firm for manufacturing the subject item. Quality assurance plan (IF ANY) related to production and inspection to be submitted in technical bid. List of Plant & Machineries required for manufacturing of subject item to be submitted.