Facility to apply for multiple items against multiple advertisement introduced. For details Click here || For any system/application related issues, please send the details of the issue to mail id: ofb.support@in.experis.com with a copy to the OFB mail id : ofbqcvrcell.ofb@ofb.gov.in
Steel rod 46+0.0/-0.50mm Dia. to specification JSS:9510-06-2012, Rev. No. 3 Code Ref. Bin T3 condition with composition restricted S%-0.010 max. P%-0.015 Max. & (S+P)%-0.022 Max. for MAG 7.62mm Barrel. Testing parameters as per QA I No. QA-1/QA/14 (Appendix Enclosed) (Q. AOD/VOD).
Specification
Steel rod 46+0.0/-0.50mm Dia. to specification JSS:9510-06-2012, Rev. No. 3 Code Ref. Bin T3 condition with composition restricted S%-0.010 max. P%-0.015 Max. & (S+P)%-0.022 Max. for MAG 7.62mm Barrel. Testing parameters as per QA I No. QA-1/QA/14 (Appendix Enclosed) (Q. AOD/VOD).
Three Layer Waterproof Breathable Fabric Dual Shade OG/White 118 cm width
Specification:- As per Appendix "A" of Prov. Specification No. IND/TC/4587(d) and amendment no. 1
Specification
Three Layer Waterproof Breathable Fabric Dual Shade OG/White 118 cm width
Specification:- As per Appendix "A" of Prov. Specification No. IND/TC/4587(d) and amendment no. 1
All component's passed report provided by firm, as Dimensional reports & Chemical composition report by NABL certified Lab. (Except this load test report also to be passed in case of springs) and Components also to be checked (Dimentional, Chemical, load reports) in Factory on sample basic, clerance should be given after passing of components.
PLASTIC SLIDE FASTNERS MEDIUM HEAVY DUTY OG WITH TWO A/LOCK SLIDER FACING THE TWO OPEN ENDS 87 CM
SPECIFICATION: IS:14181(PART 1 TO 3):AMDT NO.2, MARCH 2008.PACKING & MARKING : AS PER RELEVENT CLAUSE OF SPECIFICATION
Sampling Plan: As per relevant clause of specification
Specification
PLASTIC SLIDE FASTNERS MEDIUM HEAVY DUTY OG WITH TWO A/LOCK SLIDER FACING THE TWO OPEN ENDS 87 CM
SPECIFICATION: IS:14181(PART 1 TO 3):AMDT NO.2, MARCH 2008.PACKING & MARKING : AS PER RELEVENT CLAUSE OF SPECIFICATION
Sampling Plan: As per relevant clause of specification
All component's passed report provided by firm, as dimensional reports & chemical composition report by NABL certified Lab. ( Except this Load test report also to be passed in case of springs) and components also to be checked (dimensional, chemical, load reports) in Factory on sample basic, clearance should be given after passing of components.
All component's passed report provided by firm, as dimensional reports & chemical composition report by NABL certified Lab. ( Except this Load test report also to be passed in case of springs) and components also to be checked (dimensional, chemical, load reports) in Factory on sample basic, clearance should be given after passing of components.
Tape Nylon Thin Thick OG OFF Sizes (For Synthetic Web Equipt Improved version pouches Ammn) One set consisting of the following.
1.Tape nylon thick 13MM OG 0.32Mtr
2.Tape nylon thick 25MM OG 0.7325Mtr
3.Tape nylon thick 51MM OG 2.58Mtr
4.Tape nylon 19MM OG 8.3553Mtr
Specification
Specn No. Prov. Specn No. DMSRDE/T&GS/92/403 & JSS:8315-6 For Tape Nylon 19MM OG
Note: Firm will supply the material in set haviong same colour. One bale will consists of not more than 30 KG
9001120370 WIRE-MGSHV-1.0 SQMM
Drg No.RUSSIANSPECN:TY16505437-82
UNSHIELDED MULTISTRAND FLEXIBL
E FIBROUS LAPPED & PVC
INSULATED WIRE MGSHV-1.0 SQMM
(32/0.20) IN BROWN COLOUR
AS PER TY16-505.437-82
Specification
9001120370 WIRE-MGSHV-1.0 SQMM
Drg No.RUSSIANSPECN:TY16505437-82
UNSHIELDED MULTISTRAND FLEXIBL
E FIBROUS LAPPED & PVC
INSULATED WIRE MGSHV-1.0 SQMM
(32/0.20) IN BROWN COLOUR
AS PER TY16-505.437-82
9001121368 CON CIRS THD RP MALE SHRG
CON CIRS THD RP MALE SHRG 20/4
/8 (HARNESS CONNECTOR)
AS PER BEL PART NO. 461573051
014 / OEM PART NO.SHRG20P4ESH8
(AMPHENOL INTERCONNECT PVT. L
TD.
Specification
9001121368 CON CIRS THD RP MALE SHRG
CON CIRS THD RP MALE SHRG 20/4
/8 (HARNESS CONNECTOR)
AS PER BEL PART NO. 461573051
014 / OEM PART NO.SHRG20P4ESH8
(AMPHENOL INTERCONNECT PVT. L
TD.
Drawing no.
9001121368 CON CIRS THD RP MALE SHRG CON CIRS THD RP MALE SHRG 20/4 /8 (HARNESS CONNECTOR) AS PER BEL PART NO. 461573051 014 / OEM PART NO.SHRG20P4ESH8 (AMPHENOL INTERCONNECT PVT. L TD.
FABRICATION OF VARIOUS OPERATION OF JERSEY MENS WOOL V NECK DARK OG ITEM
FABRICATION OF VARIOUS OPERATION (200031-KNITTING, 200033-WASHING, 200034-PRESSING, 200035-CUTTING, 200008-TAILOR SKILLED HAND-I, 200001-TAILOR SKILLED MACHINE-I, 200037-SERGING, 200086-ASSIST TO SERGER, 200012-BHM, 200013-BSM, 200038-FINAL PRESS & FOLD ETC.) OF JERSEY MEN'S WOOL 'V' NECK DARK OG, AS PER SPEC. NO. S/5257/2009/TC-12.
Specification
FABRICATION OF VARIOUS OPERATION OF JERSEY MENS WOOL V NECK DARK OG ITEM
FABRICATION OF VARIOUS OPERATION (200031-KNITTING, 200033-WASHING, 200034-PRESSING, 200035-CUTTING, 200008-TAILOR SKILLED HAND-I, 200001-TAILOR SKILLED MACHINE-I, 200037-SERGING, 200086-ASSIST TO SERGER, 200012-BHM, 200013-BSM, 200038-FINAL PRESS & FOLD ETC.) OF JERSEY MEN'S WOOL 'V' NECK DARK OG, AS PER SPEC. NO. S/5257/2009/TC-12.
All component's passed report provided by firm, as dimensional reports & chemical composition report by NABL certified Lab. ( Except this Load test report also to be passed in case of springs) and components also to be checked (dimensional, chemical, load reports) in Factory on sample basic, clearance should be given after passing of components.
All component's passed report provided by firm, as dimensional reports & chemical composition report by NABL certified Lab. ( Except this Load test report also to be passed in case of springs) and components also to be checked (dimensional, chemical, load reports) in Factory on sample basic, clearance should be given after passing of components.
All component's passed report provided by firm, as dimensional reports & chemical composition report by NABL certified Lab. ( Except this Load test report also to be passed in case of springs) and components also to be checked (dimensional, chemical, load reports) in Factory on sample basic, clearance should be given after passing of components.
All component's passed report provided by firm, as dimensional reports & chemical composition report by NABL certified Lab. ( Except this Load test report also to be passed in case of springs) and components also to be checked (dimensional, chemical, load reports) in Factory on sample basic, clearance should be given after passing of components.
All component's passed report provided by firm, as dimensional reports & chemical composition report by NABL certified Lab. ( Except this Load test report also to be passed in case of springs) and components also to be checked (dimensional, chemical, load reports) in Factory on sample basic, clearance should be given after passing of components.
All component's passed report provided by firm, as dimensional reports & chemical composition report by NABL certified Lab. ( Except this Load test report also to be passed in case of springs) and components also to be checked (dimensional, chemical, load reports) in Factory on sample basic, clearance should be given after passing of components.
All component's passed report provided by firm, as dimensional reports & chemical composition report by NABL certified Lab. ( Except this Load test report also to be passed in case of springs) and components also to be checked (dimensional, chemical, load reports) in Factory on sample basic, clearance should be given after passing of components.
All component's passed report provided by firm, as dimensional reports & chemical composition report by NABL certified Lab. ( Except this Load test report also to be passed in case of springs) and components also to be checked (dimensional, chemical, load reports) in Factory on sample basic, clearance should be given after passing of components.
All component's passed report provided by firm, as dimensional reports & chemical composition report by NABL certified Lab. ( Except this Load test report also to be passed in case of springs) and components also to be checked (dimensional, chemical, load reports) in Factory on sample basic, clearance should be given after passing of components.
All component's passed report provided by firm, as dimensional reports & chemical composition report by NABL certified Lab. ( Except this Load test report also to be passed in case of springs) and components also to be checked (dimensional, chemical, load reports) in Factory on sample basic, clearance should be given after passing of components.
All component's passed report provided by firm, as dimensional reports & chemical composition report by NABL certified Lab. ( Except this Load test report also to be passed in case of springs) and components also to be checked (dimensional, chemical, load reports) in Factory on sample basic, clearance should be given after passing of components.
All component's passed report provided by firm, as dimensional reports & chemical composition report by NABL certified Lab. ( Except this Load test report also to be passed in case of springs) and components also to be checked (dimensional, chemical, load reports) in Factory on sample basic, clearance should be given after passing of components.
All component's passed report provided by firm, as dimensional reports & chemical composition report by NABL certified Lab. ( Except this Load test report also to be passed in case of springs) and components also to be checked (dimensional, chemical, load reports) in Factory on sample basic, clearance should be given after passing of components.
All component's passed report provided by firm, as Dimensional reports & Chemical composition report by NABL certified Lab. (Except this load test report also to be passed in case of springs) and Components also to be checked (Dimentional, Chemical, load reports) in Factory on sample basic, clerance should be given after passing of components.
All component's passed report provided by firm, as dimensional reports & chemical composition report by NABL certified Lab. ( Except this Load test report also to be passed in case of springs) and components also to be checked (dimensional, chemical, load reports) in Factory on sample basic, clearance should be given after passing of components.